China wholesaler Ground Hole Drill Earth Auger Hand Ground Drill 68cc tractor pto shaft

Product Description

 

Engine model: 1E48F
Displacement: 68cc
Engine power:  2.2kw/8000r/min
Engine type: 2 stroke; air cooled; single cylinder
Carburetor type: Diaphragm
Iding speed: 2700-3000r/min
Fuel tank capacity: 1200ml
Gear case output rate :  30:1
Gear case type: Diagonal gear wheel
Output shaft size :  20/22mm
Operator: Double operator
Drive drill bit dia. ability: 60/80/100/120/150/200/250/300 – 800/1000mm
Recommend drill bit: 200/250 – 800/1000mm
Notice : If you need more length, can be add extender

The characteristics and introduction:
1. Suitable for all kinds of geological.
2. Widely used in the garden, agriculture, fishing, geophysical exploration and construction etc.
3. Equipped with a variety of specifications of the drill bit, to meet different needs of users.
4. Use drilling efficiency is 20 times than artificial, to realize operate automatic, make your work more easier, more efficient.
5. Strong power, beautiful appearance, comfortable operation.
6. Portable-type, light weight, easy to carry do the wild field operations.
7. Low noise, easy to start.

1.   When can I get the quotation?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us in your email so that we will regard your inquiry priority.
2.   How can I get a sample to check your quality?
A: After price confirmation, you can require for samples to check our quality.
  If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after you place an order in the future.
3.   Can I add my logo on the carton and stickers?
A: Yes, we can do OEM service, but you need send your carton & sticker design to us.
4.   What is your MOQ?
A: Normally, we do not have MQR. If you need do OEM, the MOQ is 500 pcs.
5.   What kind of files do you accept for printing?
A: PDF, PSD, EPS, Core Draw, high resolution JPG.
6.   How long can I expect to get the sample?
A: After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 2-5 days.
7.   What about the lead time for mass production?
A: Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 15 to 20 days.
8.   What is your term of payment?
A: By T/T, 30% at first, 70% after loading or see the copy of bill of loading.
9.   What are the terms of delivery?
A: We accept EXW, FOB, CIF, etc. You can choose the 1 which is the most convenient or cost effective for you.
/* March 10, 2571 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1

Style: Chinese Style
Engine Model: 1e48f
Displacement: 68cc
Engine Power: 2.2kw/8000r/Min
Engine Type: 2 Stroke; Air Cooled; Single Cylinder
Carburetor Type: Diaphragm
Customization:
Available

|

Customized Request

post hole digger

What factors should be considered when selecting the right post hole digger for a job?

When choosing the appropriate post hole digger for a job, several factors should be taken into consideration. These factors help ensure that the selected digger is well-suited for the specific requirements of the project. Here are some key considerations:

  1. Soil Type and Conditions: The type and condition of the soil play a crucial role in determining the ideal post hole digger. Consider whether the soil is soft, sandy, clayey, compacted, or rocky. Different diggers have varying capabilities in handling these soil types. For example, harder soils may require more powerful motorized diggers or specialized blades, while softer soils may be manageable with manual or smaller-sized diggers.
  2. Project Scale and Scope: The scale and scope of the project influence the selection of a post hole digger. Determine the number of holes that need to be dug and the depth and diameter requirements of the holes. Larger projects with numerous holes may benefit from motorized diggers that offer faster and more efficient digging. Smaller projects or occasional use may warrant manual diggers for cost-effectiveness.
  3. Available Power Source: Consider the availability of power sources at the job site. Motorized post hole diggers typically require access to electricity or fuel, such as gas or propane. If the job site lacks these power sources, manual diggers may be a more suitable choice. Additionally, consider the portability and maneuverability of the digger if the job site is in a remote or hard-to-reach location.
  4. Operator Experience and Strength: Assess the experience and physical strength of the operator(s) who will be using the post hole digger. Motorized diggers are generally more powerful and require less physical effort compared to manual diggers. If the operator is inexperienced or lacks sufficient strength, it may be advisable to opt for a motorized digger to ensure efficient and safe operation.
  5. Budget and Cost Considerations: Set a budget for the post hole digging project and consider the cost of different digger options. Motorized diggers tend to be more expensive upfront but can save time and effort in the long run, especially for larger projects. Manual diggers are typically more budget-friendly but may require more physical exertion and time investment.
  6. Additional Features and Accessories: Evaluate any additional features or accessories that may be beneficial for the project. Some post hole diggers offer adjustable depth settings, ergonomic handles, or anti-vibration systems for operator comfort. Assess whether any specific accessories, such as auger extensions or sharpening tools, are available or needed for the task at hand.

By considering these factors, project managers or individuals can make an informed decision when selecting the right post hole digger. It is essential to choose a digger that matches the soil conditions, project requirements, available power sources, operator capabilities, budget, and any desired additional features or accessories.

post hole digger

What safety precautions should be followed when using a post hole digger?

When using a post hole digger, it is essential to prioritize safety to prevent accidents or injuries. Adhering to proper safety precautions ensures the well-being of the operator and anyone in the vicinity. Here are some important safety precautions to follow when using a post hole digger:

  1. Read the Instructions: Before using a post hole digger, carefully read and understand the manufacturer’s instructions and safety guidelines provided in the user manual. Familiarize yourself with the specific operating procedures, recommended safety equipment, and any limitations or precautions associated with the digger.
  2. Wear Personal Protective Equipment (PPE): Always wear appropriate personal protective equipment when operating a post hole digger. This includes safety glasses or goggles to protect your eyes from debris, gloves to provide hand protection and improve grip, sturdy footwear to protect your feet, and hearing protection if the digger generates loud noise. PPE helps minimize the risk of injuries and enhances operator safety.
  3. Inspect the Digger: Before each use, inspect the post hole digger for any signs of damage, wear, or loose components. Check the handles, blades, auger, and fasteners to ensure they are in good condition and properly secured. Any damaged or worn parts should be repaired or replaced before operating the digger.
  4. Clear the Work Area: Clear the work area of any obstacles, debris, or tripping hazards before using the post hole digger. Remove rocks, branches, or other objects that could interfere with the digging process or cause accidents. Maintain a safe distance from bystanders or other workers in the vicinity to prevent accidental contact or injury.
  5. Call Utility Companies: Before digging, contact the relevant utility companies to identify the location of underground utilities such as gas lines, water pipes, or electrical cables. This helps prevent accidental damage to utility lines, which can pose serious safety risks. Follow any guidelines provided by utility companies for safe digging practices in proximity to their infrastructure.
  6. Use Proper Digging Techniques: Follow the recommended digging techniques provided by the manufacturer. Use controlled and steady movements to dig the hole, avoiding sudden or jerky motions. Do not force the digger beyond its capabilities or apply excessive pressure, as this can lead to instability or damage to the digger. Pace yourself and take breaks as needed to prevent fatigue.
  7. Watch for Underground Hazards: While digging, be vigilant for underground hazards that may not be visible, such as tree roots, rocks, or buried debris. These obstacles can cause the digger to become unstable or abruptly stop, leading to accidents or injuries. If you encounter any unexpected resistance or obstruction, stop digging and inspect the area before proceeding.
  8. Store Safely: After use, store the post hole digger in a safe and secure location, out of the reach of children or unauthorized users. Store it in an upright position or as recommended by the manufacturer to prevent accidental tripping or damage. Proper storage ensures that the digger remains in good condition and reduces the risk of accidents during handling or retrieval.
  9. Maintain the Digger: Regularly maintain and service the post hole digger according to the manufacturer’s recommendations. This includes cleaning, lubricating moving parts, inspecting for wear or damage, and replacing any worn or damaged components. Well-maintained equipment operates more safely and efficiently, reducing the risk of accidents.

By following these safety precautions, operators can minimize the risk of accidents or injuries when using a post hole digger. Prioritizing safety through proper equipment usage, wearing appropriate PPE, inspecting the digger, clearing the work area, identifying underground utilities, using proper digging techniques, watching for hazards, storing the digger safely, and maintaining the equipment ensures a safer working environment and promotes responsible operation.

post hole digger

What is a post hole digger and how does it work?

A post hole digger is a tool used to manually or mechanically dig holes in the ground for various purposes, such as installing fence posts, signposts, or planting trees. It consists of a long shaft with handles at the top and a digging mechanism at the bottom.

The digging mechanism of a post hole digger typically consists of two sharp metal blades or scoops, known as augers, attached to the bottom of the shaft. The augers are shaped like spirals to help drive them into the ground and remove soil from the hole.

When using a manual post hole digger, the operator positions the blades at the desired location and pushes the handles downward. The downward force combined with a twisting motion allows the augers to penetrate the soil. The operator then lifts the digger out of the hole, bringing the loosened soil to the surface. The process is repeated until the desired depth is reached.

For larger or more challenging digging tasks, there are also mechanical post hole diggers available. These tools are often powered by gas engines or electric motors. Mechanized post hole diggers operate similarly to manual ones, but the power source provides the necessary force to drive the augers into the ground more easily and quickly.

Post hole diggers come in various sizes to accommodate different hole diameters and depths. The size of the augers determines the width of the hole, while the length of the shaft determines the depth that can be achieved.

In summary, a post hole digger is a tool used for digging holes in the ground. It works by using sharp augers to penetrate and remove soil, either through manual force or with the assistance of a power source in the case of mechanical diggers.

China wholesaler Ground Hole Drill Earth Auger Hand Ground Drill 68cc   tractor pto shaftChina wholesaler Ground Hole Drill Earth Auger Hand Ground Drill 68cc   tractor pto shaft
editor by CX 2024-01-10